THE PRIME MINISTER OF GOVERNMENT | SOCIALIST REPUBLIC OF VIET NAM |
No: 95/2001/QD-TTg | Hanoi, June 22, 2001 |
THE PRIME MINISTER
Pursuant to the Law on Organization of the Government of September 30, 1992;
At the proposal of Vietnam Electricity Corporation (Official Dispatch No.149 EVN/HDQT-KH of June 21, 2000); considering the State Evaluation Council’s opinions on investment projects (Official Dispatch No.95/TDNN of November 24, 2000), and opinions of the relevant ministries and branches regarding the ratification of the planning on Vietnam electricity development in the 2001-2010 period, with the prospect toward 2020 taken into account,
DECIDES:
To firmly develop, raise the quality of, and fully satisfy the demand for, load in service of people’s daily life as well as socio-economic development, security and defense; to meet the requirements of national industrialization and modernization. The power plants throughout the country are expected to produce between 45 and 50 billion kWh, by the end of 2005, 70 -80 billion kWh by 2010 and 160-200 billion kWh by 2020.
...
...
...
a/ The development of power sources must satisfy the above-said load demand, ensuring the safe, qualitative, stable, efficient and rational supply of electricity for socio-economic development. To fully exploit energy sources with economic efficiency such as hydroelectric power, gas-fired thermal power, coal-fired thermal power and oil-fired thermal power, as well as new forms of energy..., in combination with the step-by-step reasonable exchange of electricity with regional countries. To give priority to the building of hydroelectric power plants with integrated benefits such as flood fighting, water supply, electricity production. To develop small-sized hydroelectric power plants, wind power, solar power...in areas far from power grids as well as mountain, border and island regions.
b/ The balance of power sources must take into account projects on the construction with intensive investment and technological renovation of the currently operating plants; meet the environmental standards and use modern technologies for the new power plants.
- To combine power sources invested in forms of independent power plants (IPP), BOT power plants or joint ventures and exchange electricity with the neighboring countries... in order to supply electricity for each region and the whole electric system.
- To ensure that the total capacity of foreign-invested projects in forms of BOT, IPP or joint ventures... account for not more than 20% of the system’s maximum capacity.
c/ Power sources must be structured in compatibility with the practical situation and fuel sources, ensuring the system’s exploitation efficacy and characteristics of each locality so as to take initiative in the supply of electricity based on the requirements of socio-economic development and people’s daily life in the dry and rainy seasons, including the years when hydroelectric power plants fall short of water as well as the high-demand and low-demand hours, thereby ensuring enough water sources for agriculture and flood fighting when necessary.
d/ To boost the power source projects according to the set plan and schedule (see the list in Appendix 1 to this Decision).
The capacity, location and time for the construction of power source projects shall be decided by the competent authorities when approving the feasibility study report of each specific project.
3. On the development of power grids:
a/ To build power grids of from high tension to low tension synchronously with power sources. To overcome the current state of unsafe, obsolete, patchy and high-loss power grids.
...
...
...
- The competence to decide investment in power transmission lines and transformer stations shall comply with the general provisions of the Regulation on Investment and Construction Management (the Government’s Decree No.52/1999/ND-CP of July 8, 1999 and Decree No.12/2000/ND-CP of May 5, 2000). For projects with investment decided by branches and localities, the electricity branch’s agreement is required.
- Projects on transformer stations and power transmission lines of 110 kV or under shall be decided by the Managing Board of the Vietnam Electricity Corporation in accordance with this Decision.
- For power grid development projects for the years after 2010, the Ministry of Industry shall coordinate with branches and localities in directing Vietnam Electricity Corporation to specify them according to the planning and plans before submitting them to the Prime Minister for consideration and decision.
c/ The power grid development projects shall comply with the list in Appendix 2 to this Decision.
4. On the supply of electricity for rural and mountainous areas:
a/ The Ministry of Industry shall coordinate with the concerned branches and localities in directing Vietnam Electricity Corporation to continue implementing the Prime Minister’s Decision No.22/1999/QD-TTg of February 13, 1999 ratifying the project on rural electricity and Decision No.294/QD-TTg of April 7, 2000 ratifying investment in the project on rural energy according to the set plan and schedule.
b/ The Ministry of Industry shall coordinate with branches and localities in elaborating a plan on the supply of electricity for deep-lying, remote, border and island areas, proposing mechanisms and policies for effective implementation, and submit it to the Prime Minister for consideration and decision. The plan must classify areas to be supplied with electricity from the national electricity system and areas to be supplied with on-the-spot electricity from diesel, wind or solar power source, from small-sized hydroelectric power plants or geothermal sources... For the areas to be supplied with electricity from the national electricity system, where, however, the on-spot power sources can be developed efficiently, such sources should be considered for development.
5. On investment capital sources:
a/ The Vietnam Electricity Corporation shall play a key role in supplying electricity for socio-economic development and people’s daily life. It may mobilize all capital sources for investment in power source and grid projects according to mechanism of self-borrowing and self-repaying (borrowing ODA capital, credit capital inside and outside the country, borrowing export credit from equipment suppliers and capital for equipment procurement to be repaid with commodities...) and continue observing the mechanism whereby the central bodies, localities, State and people jointly develop rural power grids.
...
...
...
a/ To allow the Vietnam Electricity Corporation to retain the annual capital use levy, which constitutes a source of State budget capital allocated for investment in building power projects.
b/ To carry out plan on the rational adjustment of electricity prices from now to 2005.
a/ The Vietnam Electricity Corporation shall continue restructuring its organization, reforming administrative procedures and dividing responsibility for investment decision with a view to raising the production and business efficiency to meet the requirements of electricity development in the coming period.
b/ The Vietnam Electricity Corporation shall invest in boosting the domestic manufacture of electric equipment, first of all focusing on the manufacture of complete equipment for medium- and low-voltage grids, then proceeding to manufacture complete equipment for 110-220 kV grids, gradually reducing the volume of equipment imported from overseas.
c/ The Ministry of Industry, branches and localities shall enhance the State management and draw up specific regulations according to their respective competence so that different economic sectors may take part in electricity investment and business to meet the country’s increasing demand.
1. The Ministry of Planning and Investment:
...
...
...
- The national strategy and policy on energy.
- The planning on the rational exploitation and combined use of the country’s rivers and other energy sources.
a/ To direct the electricity branch to implement Electricity Planning V according to the set plan and schedule. To direct the Vietnam Electricity Corporation to work out a plan on organizational restructure in line with the branch development planning in the next 10 years before submitting it to the Prime Minister for approval.
b/ To regularly evaluate and update the demand for load and fuel for electricity production so as to work out a program on rational development of power sources and grids to meet the whole country’s demand after 2005. In case of big changes in the demand for load and capability of supplying fuel sources for electricity production, the Ministry should take initiative in calculating and promptly adjusting Electricity Planning V and submit it to the Prime Minister for approval.
c/ To assume the prime responsibility and coordinate with the concerned ministries and branches in promptly promulgating legal documents related to the electricity branch’s activities; finalizing the Bill on Electricity so as to report it to the Government for submission to the National Assembly for promulgation according to the set plan.
d/ To assume the prime responsibility and coordinate with the Ministry of Science, Technology and Environment, the Ministry of Construction and the Ministry of Planning and Investment in further materializing the program on the electricity "demand-supply management" (DSM), which puts forth incentive policies in combination with propagation, education, inspection and supervision... for the effective implementation of the DSM program.
e/ To assume the prime responsibility and coordinate with the Ministry of Science, Technology and Environment and concerned agencies in finalizing the pre-feasibility study report for the nuclear power plant project, and submit it to the Prime Minister for consideration and approval.
f/ To assume the prime responsibility and coordinate with the ministries and branches in directing the exchange of electricity with neighboring countries and Vietnam’s participation in the electricity system linking countries in Mekong river basin.
...
...
...
h/ To direct the Vietnam Electricity Corporation to work out the hydroelectric cascade planning; guide economic sectors to take part in the investment and business of small and medium hydroelectric power projects. Cases falling beyond its competence shall be reported to the Prime Minister for consideration and decision.
i/ To assume the prime responsibility and coordinate with the concerned ministries, branches and localities in directing the exchange of electricity with neighboring countries and Vietnam’s participation in the electricity system linking countries in the Mekong river basin.
3. The Vietnam Electricity Corporation:
a/ To take the prime responsibility for ensuring the stable, safe and sustainable supply of electricity for socio-economic development and people’s daily life.
b/ To implement solutions to reduce electricity loss to around 10% by 2010; raise the capacity and increase the number of operation hours of power plants; control the load so as to raise the business efficiency; realize the program on saving electricity in production and consumption, saving investment capital right in the Corporation and the entire society for the sustainable development of the electricity branch.
PRIME MINISTER
Phan Van Khai
...
...
...
PROGRAM ON POWER SOURCE DEVELOPMENT IN THE 2001-2010 PERIOD, WITH THE PROSPECT TOWARD 2020 TAKEN INTO ACCOUNT
(Issued together with the Prime Minister’s Decision No.95/2001/QD-TTg of June 22, 2001)
I. POWER SOURCES EXPECTED TO OPERATE IN THE 2001-2005 PERIOD
Names of plants Capacity (MW) Years of completion
a/ Power sources managed by the Vietnam Electricity Corporation:
1. Phu My 1 (mixed gas turbines ) 1,090 MW 2001
2. Pha Lai 2 (coal-fired thermal power plant) 600 MW 2001
3. Ialy hydroelectric power plant (2 remaining units) 360 MW (720 MW) 2001
4. Ham Thuan- Da Mi hydroelectric power plant 475 MW 2001
...
...
...
6. Phu My 2- 1 (Steam drum) 143 MW 2003
7. Phu My 4 (mixed gas turbines ) 450 MW 2002-2003
8. Expanded Phu My 2-1 (Steam drum) 140 MW 2003
9. Expanded Uong Bi (coal-fired thermal power plant) 300 MW 2004-2005
10. O Mon (Oil-gas) 600 MW 2004-2005
11. Dai Ninh (hydroelectric power plant) 300 MW 2005
12. Rao Quan 70 MW 2005
b/ BOT power sources:
1. Can Don (hydroelectric power plant) 72 MW 2003
...
...
...
3. Phu My 2-2 * 720 MW 2004
c/ IPP power sources:
1. Na Duong (coal) 100 MW 2003-2004
2. Cao Ngan (coal) 100 MW 2003-2004
3. Ca Mau (mixed gas turbines ) 720 MW 2005-2006
4. Cam Pha thermoelectric power plant (coal) 300 MW 2004-2005
Note: * Where the negotiation on Phu My 2-2 contract fails, the Vietnam Electricity Corporation shall look for capital sources to build the plant.
II. POWER SOURCES EXPECTED TO OPERATE IN THE 2006-2010 PERIOD
Names of plants Capacity (MW) Years of operation
and completion
...
...
...
1. Cua Dat 120 MW 2006-2007
2. Se San 3 273 MW 2006-2007
3. Na Hang (Dai Thi) 300 MW 2006
4. A Vuong 1 170 MW 2007-2008
5. Plei Krong 120 MW 2007-2008
6. Ban Mai (Ban La line) 260 MW 2008-2009
7. Dong Nai 3 & 4 510 MW 2008-2009
8. An Khe + Ka Nak 155 MW 2008-2010
9. Buon Kuop 280 MW 2008-2010
...
...
...
11. Tranh river 2 200 MW 2008-2010
12. Son La (to be built according to the Xth National Assembly’s resolution at its 9th session).
b/ Thermoelectric power sources for which the feasibility study reports shall be elaborated for submission and approval:
1. Hai Phong thermoelectric power plant (coal) 600 MW 2006-2008
2. Lang Bang thermoelectric power plant (coal) 300 MW 2008-2010
3. Southern gas-fired thermal power plant
(location depends on gas source) 1,200 MW 2007-2010
4. Thai Binh gas-fired thermal power plant - The capacity
shall depend on the gas source’s capacity 2007-2008
c/ Electricity exchange with Laos and Cambodia:
The capacity and time of exchange shall depend on the negotiation process.
...
...
...
III. ORIENTATIONS FOR POWER SOURCES TO OPERATE IN THE 2011-2020 PERIOD
a/ On hydroelectricity:
- To supplement the planning on hydroelectric power system on the main rivers, to proceed with the elaboration of pre-feasibility and feasibility study reports for projects with high efficiency so as to submit them for ratification according to current regulations.
- To actively make all-round preparations for the building of Son La hydroelectric power plant according to the prescribed contents; the construction scope and time shall be decided by the Prime Minister upon approval of the project’s feasibility study report.
- To study a number of hydroelectric power storage projects for future use.
b/ On thermoelectric power sources:
To prepare investment in projects based on the capacity of fuel sources (gas, coal, oil...) so as to define locations in Cuu Long river delta, northern provinces and coastal region for submission and approval.
c/ On nuclear power:
The Ministry of Industry shall assume the prime responsibility and coordinate with the Ministry of Science, Technology and Environment in finalizing an overall report on the development of nuclear power in Vietnam, to be submitted to the Prime Minister for consideration in 2001-2002.
...
...
...
PROGRAM ON POWER GRID DEVELOPMENT IN THE 2001-2010 PERIOD, WITH THE PROSPECT TOWARD 2020 TAKEN INTO ACCOUNT
(Issued together with the Prime Minister’s Decision No. 95/2001/QD-TTg of June 22, 2001)
No.
Names of projects
Number of circuits x km
Operation years
1. The 2001-2005 period
1
...
...
...
1 x 547
2002
2
Pleicu - Dung Quat - Da Nang
1 x 280
2003 - 2004
3
Phu My - Nha Be
2 x 49
...
...
...
4
Nha Be - Phu Lam
1 x 16
2002
5
Nha Be - O Mon
1 x 180
2004 - 2005
6
...
...
...
2 x 150
2005
2. Expectation for the 2006 - 2010 period
1
Nho Quan - Thuong Tin
1 x 75
2006 - 2010
2
Feeder to Nho Quan station of 500 KV
...
...
...
2006 - 2010
3
Phu Lam - O Mon
1 x 170
2006 - 2010
4
Ha Tinh - Nho Quan
1 x 260
2006 - 2010
...
...
...
Ha Tinh - Da Nang
1 x 390
2006 - 2010
6
Feeder to Dong Nai 3 & 4
2 x 20
2006 - 2010
3. Orientation for the 2011 - 2020 period
1
...
...
...
1 x 180
2011 - 2020
2
Son La - Nho Quan
1 x 240
"
3
Son La - Soc Son
2 x 200
...
...
...
4
Soc Son - Trang Bach
1 x 95
"
5
Trang Bach - Thuong Tin
1 x 110
"
6
...
...
...
2 x 5
"
7
Phu My - Bien Hoa
1 x 40
"
8
Bien Hoa - Tan Dinh
1 x 30
...
...
...
9
Feeder to Hoc Mon - Hoc Mon
2 x 10
"
10
Bien Hoa - Thu Duc
2 x 20
"
11
...
...
...
1 x 160
"
12
Nha Trang - Nuclear power - Di Linh
1 x 160
"
13
Nuclear power - Bien Hoa
2 x 170
...
...
...
I.2. 500 KV TRANSFORMER STATIONS
No.
Names of projects
Number of transformers x MVA
Capacity - MVA
Operation years
1. The 2001 - 2005 period
1
Ha Tinh
...
...
...
450
2002
2
Da Nang
1 x 450
450
2004
3
Di Linh
...
...
...
450
2005
4
O Mon
1 x 450
450
2005
5
Tan Dinh
...
...
...
450
2004 - 2005
6
Nha Be
2 x 600
1,200
2002
7
Phu My
...
...
...
450
2002
2. Expectation for the 2006 - 2010 period
1
Nho Quan
1 x 450
450
2006 - 2010
2
...
...
...
1 x 450
450
2006 - 2010 (Transformer 2)
3
Tan Dinh
1 x 450
450
2006 - 2010
4
...
...
...
1 x 450
450
2006 - 2010
5
Dung Quat
1 x 450
450
2006 - 2010
3. Orientation for the 2011 -2020 period
...
...
...
Son La
1 x 450
450
2011 - 2020
2
Soc Son
2 x 1000
2,000
"
...
...
...
Trang Bach
1 x 450
450
"
4
Viet Tri
2 x 450
900
"
...
...
...
Hoc Mon
2 x 750
1,500
"
6
Bien Hoa
2 x 450
900
"
...
...
...
Nha Trang
1 x 450
450
"
8
Thanh Hoa
1 x 450
450
"
...
...
...
Thu Duc
2 x 600
1,200
"
1. The 2001 - 2005 period
No.
Names of projects
Number of transformers x MVA
Capacity (MVA)
...
...
...
Northern provinces
1
Mai Dong
2 x 250
500
2001 - 2002
Replacement of transformers
2
Soc Son
...
...
...
250
2001 - 2005
3
Bac Giang
1 x 125
125
2001
...
...
...
Pho Noi
2 x 125
250
2001 - 2005
5
Trang Bach
1 x 125
125
...
...
...
6
Quang Ninh
1 x 125
250
2001- 2005
7
Vat Cach
...
...
...
125
2001
8
Viet Tri
2 x 125
250
2001 - 2005
...
...
...
Ha Tinh
1 x 125
125
2002
10
Thai Binh
1 x 125
125
...
...
...
11
Dinh Vu
1 x 125
125
2004 - 2005
12
Bac Ninh
...
...
...
125
2004 - 2005
13
Xuan Mai
1 x 125
125
2002
...
...
...
Nam Dinh
1 x 125
125
2002 - 2003
Second transformer
15
Uong Bi
1 x 125
125
...
...
...
16
Yen Bai
1 x 125
125
2004 - 2005
17
Nghi Son
...
...
...
125
2002
18
Thai Nguyen
1 x 125
125
2002 - 2005
Second transformer
...
...
...
1
Hoa Khanh
2 x 125
250
2001 - 2005
2
Hue
1 x 125
...
...
...
2001
3
Dung Quat
2 x 63
126
2001 - 2005
4
...
...
...
1 x 125
125
2002 - 2003
Second transformer
5
Krong Buk
1 x 125
125
2002
...
...
...
6
Nha Trang
1 x 125
125
2003
"
Southern provinces
1
Long Binh
...
...
...
250
2001
Replacement of transformers
2
Long Thanh
2 x 125
500
2001 - 2005
...
...
...
Binh Chuan (Bien Hoa)
2 x 250
500
2001 - 2005
4
Bao Loc
1 x 125
125
...
...
...
5
Phu Lam
2 x 250
500
2001 - 2002
Replacement of transformers
6
Thu Duc
...
...
...
350
2002
7
Tao Dan
2 x 250
500
2002 - 2005
...
...
...
Cat Lai
2 x 250
500
2002 - 2003
9
South of Sai Gon
1 x 250
250
...
...
...
10
Ba Ria
1 x 125
125
2002 - 2003
11
Vung Tau
...
...
...
125
2002 - 2003
12
Tan Dinh
1 x 250
250
2004 - 2005
...
...
...
Dai Ninh
1 x 63
63
2005
14
Vinh Long
2 x 125
250
...
...
...
15
Thot Not
2 x 125
250
2002 - 2003
16
Kien Luong
...
...
...
125
2002 - 2003
17
My Tho
1 x 125
125
2003 - 2004
...
...
...
Ham Thuan
1 x 63
63
2001
19
Bac Lieu
1 x 125
125
...
...
...
20
Chau Doc
1 x 125
125
2003-2004
21
Tan Rai
...
...
...
250
2005
Aluminum treatment
22
Tri An
1 x 63
63
2004 - 2005
Second transformer
...
...
...
Northern provinces
1
Yen Phu
1 x 250
250
2006 - 2010
Second transformer
2
Trang Bach
...
...
...
125
"
Second transformer
3
Bac Giang
1 x 125
125
"
Second transformer
...
...
...
Thai Binh
1 x 125
125
"
5
Van Tri
1 x 250
250
...
...
...
6
Hai Duong
1 x 125
125
"
7
Dinh Vu
...
...
...
125
"
Second transformer
8
Vat Cach
1 x 125
125
"
Second transformer
...
...
...
Hai Phong thermoelectricpower plant
2 x 125
250
��
10
Dong Hoa
2 x 250
500
...
...
...
Replacement of transformers
11
Quang Ninh thermoelectric power plant
2 x 125
250
��
12
Son Tay
...
...
...
125
��
13
Xuan Mai
1 x 125
125
"
Second transformer
...
...
...
Phu Ly
1 x 125
125
��
15
Nghi Son
1 x 125
125
...
...
...
Second transformer
Central provinces
1
Hue
1 x 125
125
2006 - 2010
Second transformer
2
...
...
...
1 x 125
125
2006 - 2010
3
Dung Quat industrial park
1 x 250
250
2006 - 2010
...
...
...
4
Tuy Hoa
1 x 125
125
2006 - 2010
5
Krong Buk
1 x 125
...
...
...
2006 - 2010
Replacement of transformers
Southern provinces
1
South of Sai Gon
1 x 125
250
2006 - 2010
Second transformer
...
...
...
Hoa Xa
2 x 250
500
2006 - 2010
3
Tan Binh
2 x 250
500
...
...
...
4
Song May
1 x 125
125
2006 - 2010
5
Nhon Trach
...
...
...
125
2006 - 2010
6
Vung Tau
1 x 125
125
2006 - 2010
Second transformer
...
...
...
My Tho
1 x 125
125
2006 - 2010
Second transformer
8
Long An
2 x 125
250
...
...
...
9
Ben Tre
1 x 125
125
2006 - 2010
10
Cao Lanh
...
...
...
125
2006 - 2010
11
Kien Luong
1 x 125
125
2006 - 2010
Second transformer
...
...
...
Ca Mau
1 x 125
125
2006 - 2010
13
Soc Trang
1 x 125
125
...
...
...
14
Phan Thiet
1 x 125
125
2006 - 2010
15
Trang Bang
...
...
...
250
2006 - 2010
16
Chau Doc
1 x 125
125
2006 - 2010
Second transformer
...
...
...
Northern provinces
1
Dong Anh
2 x 250
500
2011- 2020
2
Dong Trieu
...
...
...
250
2011- 2020
3
Do Son
2 x 125
250
2011- 2020
...
...
...
Bim Son
2 x 125
250
2011- 2020
5
Cai Lan
2 x 250
500
...
...
...
6
Cua Ong
2 x 125
250
2011- 2020
7
Hung Yen
...
...
...
250
2011- 2020
8
Hoa Lac
2 x 125
250
2011- 2020
...
...
...
Lao Cai
2 x 125
250
2011- 2020
10
Lang Son
2 x 125
250
...
...
...
11
Luu Xa
2 x 125
250
2011- 2020
12
Phu Tho
...
...
...
250
2011- 2020
13
Quynh Luu
2 x 125
250
2011- 2020
...
...
...
Son La
2 x 125
250
2011- 2020
15
Son Tay
2 x 125
250
...
...
...
16
Sai Dong
2 x 250
500
2011- 2020
17
Thach Khe
...
...
...
500
2011- 2020
18
Trinh Xuyen
2 x 125
250
2011- 2020
...
...
...
Trang Bach
2 x 125
250
2011- 2020
20
Tuyen Quang
2 x 125
250
...
...
...
21
Vinh Phuc
2 x 125
250
2011- 2020
22
Vung Ang
...
...
...
250
2011- 2020
Central provinces
1
Cam Ranh
2 x 125
250
2011- 2020
...
...
...
2
Dong Ha
2 x 125
250
2011- 2020
3
Ba Don
2 x 125
...
...
...
2011- 2020
4
Dung Quat industrial park
2 x 250
500
2011- 2020
5
...
...
...
2 x 125
250
2011- 2020
6
Kon Tum
2 x 125
250
2011- 2020
...
...
...
7
Quang Nam
2 x 125
250
2011- 2020
Southern provinces
1
Da Lat
...
...
...
250
2011- 2020
2
Duc Trong
2 x 125
250
2011- 2020
...
...
...
An Phuoc
2 x 125
250
2011- 2020
4
An Phuoc
2 x 125
250
...
...
...
5
Binh Chanh
2 x 250
500
2011- 2020
6
Binh Long
...
...
...
250
2011- 2020
7
Binh Phuoc
2 x 125
250
2011- 2020
...
...
...
Song Be industrial park
2 x 125
250
2011- 2020
9
Long Xuyen
2 x 125
250
...
...
...
10
Nhon Trach
2 x 125
250
2011- 2020
11
Sa Dec
...
...
...
250
2011- 2020
12
Soc Trang
2 x 125
250
2011- 2020
...
...
...
Song May
2 x 125
250
2011- 2020
14
Tan Dinh
2 x 250
500
...
...
...
15
Tan Binh
2 x 250
500
2011- 2020
16
Tay Ninh
...
...
...
250
2011- 2020
17
Tam Phuoc
2 x 125
250
2011- 2020
...
...
...
Thap Cham
2 x 125
250
2011- 2020
19
Thu Duc Bac
2 x 250
500
...
...
...
20
Tra Vinh
2 x 125
250
2011- 2020
21
Xuan Loc
...
...
...
250
2011- 2020
...
...
...
II. 1. 220 KV TRANSFORMER STATIONS
No.
Names of projects
Number of circuits x km
Operation years
Notes
1. Projects to be operating and completed in the years of 2001 to 2005
Northern provinces
...
...
...
Nam Dinh - Thai Binh
1 x 30
2002
2-circuit poles
2
Thai Binh - Hai Phong
1 x 45
2002
"
...
...
...
Bac Giang - Thai Nguyen
1 x 55
2003 - 2004
4
Viet Tri - Son La
1 x 160
2003 - 2004
Temporary operation of 110 kV power lines
...
...
...
Dong Hoa - Dinh Vu
2 x 17
2004 - 2005
6
Viet Tri - Yen Bai
1 x 75
2004 - 2005
...
...
...
Feeder to Ha Tinh station
2 x 7
2002
8
Uong Bi - Trang Bach
2 x 19
2004 - 2005
...
...
...
1
Hoa Khanh - Hue
2 x 80
2001
2
Da Nhim - Nha Trang
1 x 140
2003 - 2004
...
...
...
Southern provinces
1
Phu My - Cat Lai
2 x 35
2001
Cables + DZK
2
Cat Lai - Thu Duc
2 x 10
...
...
...
Cables + DZK
3
Nha Be - Tao Dan
2 x 10
2002 - 2003
4
Ba Ria - Vung Tau
2 x 15
...
...
...
5
Dai Ninh - Di Linh
2 x 39
2005
6
Rach Gia - Bac Lieu
1 x 105
...
...
...
7
Tan Dinh - Binh Chuan
2 x 18
2002 - 2004
8
Nha Be � South of Sai Gon
2 x 7
...
...
...
9
Thu Duc - Hoc Mon
1 x 16
2002 - 2003
Circuit 2
10
Long Binh - Thu Duc
1 x 16
...
...
...
"
11
My Tho - Ben Tre
1 x 25
2002
Temporary operation of 110 kV power lines
12
Thot Not-Chau Doc-Tinh Bien
1 x 96
...
...
...
13
Joint to O Mon power plant
2 x 15
2004
14
O Mon - Thot Not
2 x 28
...
...
...
15
Bao Loc - Tan Rai
2 x 20
2005
Designed to be made of aluminum
2. Projects designed for the 2006 - 2010 period
Northern provinces
1
...
...
...
2 x 160
2006 - 2010
2
Feeder to Nho Quan station
2 x 5
"
3
...
...
...
2 x 17
"
4
Hai Phong thermoelectric power plant - Vat Cach
2 x 19
"
5
...
...
...
2 x 15
"
6
Ha Tinh - Thach Khe
2 x 9
"
7
...
...
...
2 x 25
"
8
Van Tri - Chem
2 x 10
"
9
...
...
...
2 x 8
"
Circuit 2
10
Vinh - Ha Tinh
1 x 50
"
11
...
...
...
2 x 110
"
12
Lang Bang thermoelectric power plant - Hoanh Bo
2 x 15
"
13
...
...
...
2 x 30
"
14
Thai Binh thermoelectric power plant - Thai Binh
2 x 20
"
Central provinces
...
...
...
Dung Quat - Dung Quat steel
2 x 9
2006 - 2010
2
Ha Song Ba - Tuy Hoa
2 x 40
"
...
...
...
Quy Nhon - Tuy Hoa
1 x 95
"
4
Tuy Hoa - Nha Trang
1 x 110
"
...
...
...
Dong Hoi - Hue
1 x 165
"
6
Pleikrong - Pleicu
1 x 50
"
...
...
...
A Vuong - Da Nang
1 x 80
"
8
Buon Kuop - Krong Buk
2 x 40
"
...
...
...
Tranh river 2- Dung Quat
2 x 75
"
10
SeSan 3 - Pleicu
2 x 35
"
...
...
...
1
Hoc Mon - Hoa Xa
2 x 10
2006 - 2010
2
Tra Noc - Soc Trang
2 x 75
"
...
...
...
3
Bac Lieu - Soc Trang
1 x 53
"
4
Bac Lieu - Ca Mau
1 x 70
"
...
...
...
5
Da Nhim - Da Lat
1 x 50
"
6
Kien Luong - Chau Doc
1 x 75
"
...
...
...
7
Trang Bang - Tan Dinh
2 x 35
"
3. Projects designed for the 2011 - 2020 period
Northern provinces
1
Thanh Hoa - Vinh
...
...
...
2011 - 2020
Circuit 2
2
Hoa Binh - Son Tay
1 x 50
"
3
Quang Ninh thermoelectric power plant - Mong Duong
...
...
...
"
4
Bac Giang - Pha Lai
1 x 25
"
Circuit 2
5
Yen Bai - Son La
...
...
...
"
6
Son La - Son La provincial capital
1 x 20
"
7
Nam Dinh - Ninh Binh
...
...
...
"
Circuit 2
8
Pho Noi - Sai Dong
2 x 20
"
9
Pho Noi - Hung Yen
...
...
...
"
10
Hoanh Bo - Cai Lan
2 x 12
"
11
Thanh Hoa - Ba Che
...
...
...
"
12
Tuyen Quang - Thai Nguyen
1 x 70
"
13
Dong Anh - Sai Dong
...
...
...
"
14
Da Phuc - Dong Anh
2 x 20
"
15
Hung Yen - Long Boi
...
...
...
"
16
Yen Bai - Lao Cai
1 x 110
"
17
Son La - Huoi Quang
...
...
...
"
18
Thai Nguyen - Luu Xa
1 x 11
"
19
Thai Nguyen - Bac Kan
...
...
...
"
20
Bac Giang - Lang Son
1 x 60
"
21
Son La provincial capital - Tuan Giao
...
...
...
"
22
Bac Me - Dai Thi
2 x 60
"
23
Ha Tinh -Vung Ang
...
...
...
"
Central provinces
1
Da Nang - District 3
2 x 8
"
2
...
...
...
2 x 43
"
3
Serepok - Krong Buk
2 x 80
"
Southern provinces
...
...
...
Tra Noc - Vinh Long
1 x 35
2011 - 2020
Circuit 2
2
Ham Thuan - Phan Thiet
1 x 60
"
...
...
...
Long Xuyen - Thot Not
1 x 15
"
4
Long Binh - Tam Phuoc
2 x 6
"
...
...
...
Feeder to Cao Lanh - Cao Lanh
2 x 15
"
6
Vinh Long - Tra Vinh
1 x 65
"
...
...
...
Tan Dinh - Tay Ninh
2 x 72
"
8
Tan Dinh - Tan Dinh industrial park
2 x 8
"
...
...
...
Cai Lay - O Mon
1 x 90
"
Circuit 2
10
Cai Lay - Thot Not
1 x 80
"
Circuit 2
...
...
...
My Tho - Ben Tre
1 x 25
"
12
Bac Lieu - Ca Mau
2 x 65
"
...
...
...
Xuan Loc - Long Binh
1 x 40
"
14
Long Thanh - An Phuoc
2 x 8
"
...
...
...
Nhon Trach - Long Binh
2 x 15
"
16
Nhon Trach - Cat Lai
2 x 10
"
...
...
...
Nha Trang - Cam Ranh
1 x 35
"
18
Tay Ninh - Binh Long
2 x 75
"
...
...
...
Dong Nai 6 - Di Linh
2 x 30
"
- 1 Decree No. 12/2000/ND-CP of May 05, 2000, amending and supplementing a number of articles of the investment and construction management regulation issued together with the Government’s Decree No. 52/1999/ND-CP of July 8, 1999
- 2 Decree No. 52/1999/ND-CP of July 8, 1999, promulgating the regulation on investment and construction management